en Polska

News

Construction of Wind Turbines near Kutno

25.11.2011

At the turn of October and November, our Company installed foundation piles for wind turbines in Kaszewy Dworne and Plecka Dąbrowa near Kutno. The load tests performed on site allowed for pile length optimization of up to 20% as compared to design assumptions. The installation of the final piles took one day for each of the wind turbines.