pl en

Pile Foundation for Three Small Bridges in Less than Four Days

03-10-2016

We installed reinforced concrete pile foundations for three small bridges:  in the town of Wieniec, n.  Włocławek (36 piles),  Świecie n. Grudziądz (24 piles) and Kamyk n. Kozienice (10 piles). All the works were completed in less than four days. It was possible due to a well-chosen technology, good designs, precise preparations and close cooperation with the General Contractor.

news list