pl en

Driven Precast RC Piles in Urban Development – Foundation for Residential Building in Gniezno

22-06-2017

We successfully completed piling works with driven precast RC piles for foundation of a residential building in Gniezno, located in the middle of old and modern residential development. Before starting piling works, we conducted an in-depth analysis of soil and site conditions and prepared piling and monitoring designs. The results of piling work monitoring and pile load tests allowed for making a good use of all the advantages of the precast pile technology. Owing to that we were able to quickly – in 6 days only – construct economically, technically and organizationally effective piled foundation, ready to transfer the required loads directly after the completion of works.

Video

Film vimeo
news list